In recent years, second-hand housing has become one of the first choices for modern young people to buy a home. It is not only cheap but it is often located in urban areas. However, second-hand houses have more or less own defects, so special attention must be paid to the construction of second-hand houses. Next Xiaobian introduced second-hand housing renovation steps .
First, housing acceptance and measurement design
Acceptance of house receipt refers to a preliminary understanding of the house after the owner of the house takes it to the house, discovering in a timely manner what needs to be replaced, which designs need to be changed, which designs can be used, which designs can be discarded, and so on. After understanding the basic situation of the new house, you can ask the designer to measure the house and make the best design plan for the house.
Second, the pre-construction survey and start procedures
The measurement before construction is different from the previous measurement. The construction measurement is for more accurate installation of various building materials during construction. For example, measuring the size of the bathroom is to be able to lay a suitable waterproof material in accordance with this scale. The procedures that need to be completed prior to commencement of work include: residential property renovation agreement, handling of "work permit", handling of pass for workers, payment of renovation deposit and garbage clearance freight. Prepare the formalities before starting construction for formal construction.
Third, install the security door and the main body to change
The installation of security doors is the first step in formal renovation. This is to prevent people from falling into trouble during the renovation process. The second is the demolition of the theme, the theme of demolition and reform will be in accordance with the pre-planned design drawings to carry out demolition and renovation, the unsuitable demolition of the wall or circuit like transformation. Until you can reach the layout of the plan.
Fourth, hydropower reform, overall construction and inspection
The main task of hydropower reform is to worsen the aging wires or drain pipes in the second-hand houses, re-install or modify the circuit, and find a safe place for the wires. The main purpose of the water pipe reform is to prevent leakage of water between the houses. After we left, we will feel relieved. The overall construction is the largest one in the entire renovation of second-hand houses, including construction projects such as tiling, ceiling painting, carpentry, and cement workers. Then inspect the house, the inspection is mainly to check the construction results, if no problem is found, the harmful gas in the house will be exhausted and dried after being able to stay, and if problems are found, contact the construction team in time to request rectification.
Editor's summary: The second-hand house renovation steps are introduced here. For more information, you can follow this site information.
Decoration steps
Bath Mirror,Bathroom Mirror,Sight Glass,Quartz Glass
SHANDONG TOP LEADER GLASS CO.,LTD , https://www.topleaderglass.com