Second-hand housing renovation renovation note

Many families will choose to redecorate when they purchase second-hand housing. Especially in high-frequency sub-use areas such as bathrooms, toilets, washbasins, and internal drains are even more of a problem. Many people choose to completely refurbish the bathroom before checking in. Then do you know what steps the second-hand house bathroom renovation has?

[How to renovate second-hand house bathroom]

Step 1. Find out about family life and family opinions

Before the second renovation or second-hand house renovation bathroom, you need to understand the family's views and habits, after all, living like it, living comfort is the most important, the happiness index will increase; need to plan the future, if there is a home Old people and children should take into account where they need to pay attention.

Step 2. Understanding Floor Plans

Through the floor plan, there is a general understanding of the size of the bathroom, the drainage location, etc., and a few basic items for the preliminary arrangement of the bathroom are required.

Step 3. Wall relocation

When many families renovate the bathroom, they like to knock out the original bathroom wall tiles or floor tiles and lay new bricks. This requires that waterproof work be done on the bathroom floor.

【Precautions】

On the wall, about 30 cm of waterproof paint should be installed to prevent water from accumulating through the wall; if the wall of the bathroom is a non-load-bearing light wall, the whole wall should be painted with waterproof paint; if your home uses two Fan-type shower screen, the associated two walls should be painted; if your home uses a bathtub, the wall adjacent to the bathtub, the height of the waterproof coating is also higher than the upper edge of the bathtub. The wall tiles should be covered to resist the erosion of moisture and protect the waterproof layer of the walls. At the same time, it is easy to maintain cleanliness and beauty. The families who use the ceiling should pay attention to the parts covered by the ceiling and also be covered with tiles in order to protect them well. The entire wall.

After chiseling the original floor tiles, cement mortar must be used to level the floor and then waterproof. This will prevent leakage of the waterproof coating due to uneven thickness. The seams should be brushed into place. The seams between the bathroom wall and the seams between the upper and lower water pipes and the ground are the most prone to problems. In the construction, we must urge the workers to handle the edge corners and apply them in place;

After the second renovation of the bathroom was completed, all the toilets in the bathroom were blocked, and a 25 cm high “can” was built at the entrance. Then, 20 cm of water was poured into the bathroom. After 24 hours, you will check whether there is any leakage around the wall and floor to ensure the quality of the bathroom waterproofing project.

Step 4: Refurbishment of Toilets, Washbasins, Faucets, etc.

Bathroom washbasins and faucets are easy to refurbish. Toilet relocation can be done on the ground to dig pits, dig out the original main branch pipes, connect the original main branch pipes with new PVC pipes, and change the toilet water outlet to the new one specified by the customer. position.

The easiest way to do wet and dry zoning in the bathroom is to install a shower room to separate the baths, which can effectively avoid the spread of water and moisture. The shower room is usually installed in the corner of the bathroom to keep the outside area dry. . Showers are available in a variety of shapes, including square, rectangular, fan-shaped, and diamond-shaped shapes.

Summary: second-hand housing renovation steps and precautions, explain to here. I hope to be helpful. For more exciting content, please continue to pay attention to this website information platform.

Bathroom Renovation Second-hand House Renovation Toilet Decoration Reminder Toilet Renovation Old House Toilet Renovation

5m Tape Measure

Liang metalworking Tools Co., Ltd. has more than 200 employees, who have undergone professional technical training and rich production technology experience. The company has self-supporting import and export rights, and more than 90% of its products are exported to Italy, More than 60 countries and regions, including Spain, the Netherlands, Poland, Russia, Nigeria, India, Iran, South Africa, Japan, Brazil, ELDOR, etc

5M Tape Measure,Metal Measuring Stick,Tape Rule Measurement,Long Steel Measuring Tape

Henan Liangjin Tools Co.,Ltd , https://www.liangjintools.com