The steps of home renovation detail the process of home renovation

A very long and complicated process of home decoration, there are occasional omissions during the renovation, so we need to plan the process and steps of the home renovation before the renovation. Many of the renovations of the house did not have any understanding before the renovation. After the renovation of the house, I found that there were a lot of details of the omissions in the house. In order to have more friends do not have such an approach, let's take a look at the steps and processes of home renovation with Xiaobian.


家庭装修的步骤


Introduction to the steps of home renovation:


1. Pre-plan

First of all, according to your own lifestyle plan, and make a specific measurement of your own room, you should not be lazy, the best personal measurement, the measurement content includes: clearly clarify the area touched by the renovation process. In particular, the tile area, wall paint area, wallpaper area, floor area; clear the primary wall standard. In particular, it is necessary to plan the wall standard for furniture in the future.


2, the main body of the change

Entering the construction time, the main body demolition is the first project, including the demolition, wall, shovel, demolition, plastic window and so on. The main body of the demolition is white, and the plan of the construction site is first set up. The demolished garbage should be cleaned up in time to ensure the cleanness of the room, also for the convenience of construction.

At this point, the finished door is set. At this time, it is best to go through the cabinets, hoods, stoves, and water heaters, and you can be sure.


3 Hydropower transformation:

Before the water circuit was rebuilt, the main structure demolition should be basically completed. The first measurement of the cabinet should also be carried out between the hydropower transformation and the main body demolition. In fact, the so-called cabinet measurement did not have any actual content. Because the wall and the ground were not treated, the cabinet designer could not give the specific design size, but only the water outlet and the hood socket reserved by the developer. Location, make some relevant suggestions. mainly include:


(1) See if the position of the hood socket affects the installation of the hood later;


(2) See if the position of the water meter is appropriate;


(3) Check if the position of the water inlet is convenient for installing the sink later.


(4) For the first measurement of the cabinet, a slightly experienced friend can do it himself. After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof, it is recommended to be waterproof.


4, carpenter

Carpenters, bricklayers, and oilers are the "three brothers" in the construction process. The order of operation is: wood--watt--oil. The entry criteria are -- who is dirty and who is first. "Whoever gets dirty first" is also one of the criteria for choosing a home improvement. In fact, carpenter work such as bag riser, decoration ceiling, plaster line can be considered as a detailed link of the main body demolition. It does not conflict with the water circuit transformation. Sometimes it needs some points. cooperation. Taking into account the easy and humid environment of the kitchen and bathroom, the material of the riser must not be used with wooden keels! Everyone must be careful, even if the anti-corrosion coating on the wooden keel is not enough!


5, tiling

In the process of "Watt Workers", the following three parts of the equipment were touched: the equipment for passing the stone and the marble window sill. The equipment for passing the stone can be finished with the paving slabs. After the paving slabs, the equipment of the marble sills is usually finished after the window sills are completed. The workers of the equipment marble prepare the glass glue, and the marble and window sashes are sealed with glass glue. It is. Floor drain equipment. The floor drain is the first entry in the home improvement hardware because it is going to work with the floor tiles. Therefore, when the students first visited the building materials, they bought the floor drain early. Hood equipment. The hood is the first entry of the home appliance. After the kitchen wall and floor tiles are laid, the equipment hood can be considered.


6, brush wall finish:

The "oiler's third child" entered the market, mainly finishing the wall surface treatment, brushing the topcoat, and painting the furniture for the "carpentry boss". Students who are ready to paste wallpapers only need to let the "oiler's third child" do the grassroots treatment on the wall of the wallpaper. As for whether or not to leave the last coat, I personally feel that this problem is not necessarily too true. From the experience of my decoration, the significance of leaving a top coat is not very big, because the latter operation is no more dirty than painting. .


7, kitchen and bathroom ceiling:

The cabinet ceiling is the first step in the installation process, and it is still continuing the “packaging” of the home. At the same time as the kitchen and bathroom ceiling, the kitchen's moisture-proof ceiling lamps and exhaust fans (Yuba) should have been bought. It is recommended that you install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave the thread and opening.


8, kitchen cabinet installation

After the ceiling is over, you can install it on the door of the cabinet. If you are successful, you can finish the day. At the same time, there are also sinks (which may not include upper and lower water parts) and gas stoves. Before installing the cabinets, it is best to coordinate the property to pass the gas, because the gas stove needs to be tested after it is installed.


9, wooden door equipment

On the second day of the cabinetry, as soon as the wooden door was measured more than a month ago, it was now possible to make an appointment. If it is smooth, it is also a day's time. The door hinges, door locks and ground suctions are required together. The students are about to prepare about the hardware beforehand. Suppose you want the wooden door manufacturers to use the window cover and the mouth of the wooden door. The time measured by the wooden door manufacturer should also be measured together, and together with the equipment on the same day of the wooden door equipment, the equipment time of the marble window sill should be considered to be wrong, and arranged in the window cover equipment. after that.


10, floor equipment

On the second day of the wooden door equipment, the equipment floor can be used. If it is smooth, it is also a day. Floor equipment needs to pay attention to the following questions:


(1) Before the floor equipment, it is best to let the factory visit the site to find out whether it is necessary to level or some leveling. Some decoration companies or renovation teams will recommend that the students level on the ground or some leveling, which is subject to the internship survey of the floor manufacturer; 2) Before the floor equipment, the floor of the pavement floor of the home should be cleaned and cleaned to ensure monotony on the ground, so do not use water during the cleaning process.


Spread wallpaper:

On the second day of the floor installation, the house was cleaned up, and it was possible to spread the wallpaper. If it was smooth, it would be the same day. If there are conditions, the floor should be protected on the day of laying the wallpaper; it doesn't matter if there is no condition. It is no problem to hand over the wallpaper glue left on the floor to the cleaning. Before laying the wallpaper, try to do "do not have anything" on the wall.


Radiator installation:

On the second day after the wallpaper is laid, replace the radiator or dismantle the radiator to hang the radiator on the wall. The same is the time of day.


家庭装修的步骤


Home decoration needs to follow the steps, not what you want to do. The above is the step and process of the home decoration introduced by Xiaobian today. It is over here. For more information, please continue to pay attention to the decoration home network.



More related wonderful reading:

What is the home renovation process? Home renovation steps

Introduction to home renovation steps

LED SPOT LIGHT

Led Spot Light,Downlight Spot Light,Spot Light Aluminum,Store Spot Light

JIANGMEN MICHEN LIGHTING CO.,LTD , https://www.jmledbulb.com