State Grid Chongqing City Power Supply: Weaving Anti-Violation Safety Net

On April 13th, the inspection and inspection team for safety and quality of leading cadres and management personnel of the State Grid Chengkou County Power Supply Company went to all spring inspections and infrastructure construction sites to conduct a comprehensive investigation on the phenomenon of “three violations” and unsafe behavior on each site. Exposure.

Supervise on-site construction operations to strictly implement the “seven measures” of safety management and control:

First, the personnel of the production units and the construction team must participate in the safety training organized by the company.
The second is to strengthen on-site safety control and implement accountability for violation of the regulations.
The third is to strengthen the implementation of construction and maintenance site organization and technical measures.
Fourth, before and after the work, all units must organize personnel to hold pre-class and post-class meetings, and publicize dangerous points and preventive measures that may exist in the work to each working class member.
Fifth, before the start of work, strictly carry out item-by-item inspections of safety tools and labor protection products used at the scene, and prohibit the use of unqualified safety tools on site.
Sixth, all units must organize workers to carry out on-site inspections of the scope of maintenance (construction) operations that require power outages, retained live parts, and job site conditions, environment, and other hazards before starting work.
Seventh, after the equipment maintenance and repairing unit, construction and overhauling unit finishes work on site, the two parties shall jointly inspect the construction site to ensure that the site’s safety tools and construction materials and other remaining materials are cleaned up. After the “Ancuo” deployed on site is completely removed, Can apply for the end of work ticket. Once the work ticket has been terminated, maintenance or construction personnel are strictly forbidden to climb the tower or return to the site to continue their work, and resolutely put an end to subsequent accidents.

It is reported that in the next stage, Chengkou Company will take special measures to prevent accidents, such as the unusually heavy task of pre-summer maintenance, the large amount of operation of power grids, and the frequent occurrence of personal accidents and personnel responsibility accidents.

This article is a reprint of online media. It only represents the author's point of view. It has nothing to do with this site. If news articles and comments infringe your legal rights, please call us and we will handle it in a timely manner.

Flexible Joint

Flexible Joint,Flange Joint Corrugated Tube,Flange Welded Bellows,Threaded Bellow

Hangzhou Ehase-Flex Co.,Ltd. , https://www.ehasetech.com