Most of the causes of leakage in the kitchen are waterproof, so Nantong Building Materials Network teaches you how to prevent leaks:
1. Before the decoration, carefully check whether there is leakage in the kitchen and bathroom on the upper floor. If there is, you should first complete the waterproof project on the upper floor and then renovate. If there is no resident or upstairs for the other reason, the waterproofing project on the upper floor cannot be disposed of for a while, then measures should be taken to remedy the problem: the polyurethane is applied to the bottom of the leaking part, but the plastering layer of the leaking part should be disposed of. The base layer should be dry.
2. When the kitchen and bathroom are being renovated, if the original wall and floor tiles are knocked out and refurbished, no matter whether the waterproof layer has been used or not, the waterproof layer should be redone before re-applying the wall and floor tiles. The waterproof layer of the surrounding side wall is 200mm high and has a bathtub. The waterproof layer is 200mm above the top of the bathtub. When there is a shower and there is no other waterproof measure, the waterproof layer should be sprayed to all parts of the shower.
3. Waterproof treatment during kitchen and bathroom renovation: If the waterproof layer is not used before, add the waterproof layer according to the above method; if the waterproof layer has been used, it should be carefully checked to see if the waterproof layer is in place, whether it is damaged or damaged. After the repair, the water injection test shall be carried out, and the wall and the surrounding wall shall be free of leakage and no moisture as the qualified standard.
4, the kitchen, bathroom and other wet parts of the water after the completion of the renovation, the elevation of the ground should be lower than the elevation of the hall or corridor floor. Stones that are not afraid of water should be installed at the door of the kitchen and bathroom. Waterproofing should be done at the roots to prevent water from seeping from the door to the hall.
5, the bathroom kitchen and the walkway are separated from the threshold of the special need to pay attention. Before installing the marble door sill, it needs to be filled with cement mixing. After the flat door is installed, the door can be placed, so that the daily cleaning of the toilet and the kitchen can be effectively blocked and spaced, effectively achieving the waterproof and leakproof effect. .
Editor in charge: Nantong GO Jiaju
Folding Led Desk Lamp,Folding Led Reading Desk Lamp,Led Foldable Charging Desk Lamp,Folding Led Eye Protection Table Lamp
NINGBO ZHENGUO INTELLINGENT LIGHTING CO.,LTD , https://www.zguolight.com