1. Pressure gauge, water level gauge, safety valve, sewage device, water supply valve, steam valve, etc., check whether the performance meets the requirements, and whether other valves are in good condition.
2. The automatic control device system, including the flame detector, water level, water temperature detection, alarm device and various interlocking devices, display control system and other performance status meet the requirements.
3. Whether the water supply system includes the water level of the water storage tank, the water supply temperature, and the water treatment equipment.
4. Fuel combustion system, including the fuel quantity, transmission line, combustion equipment, ignition equipment, fuel cut-off device, oil pump, etc.
5, ventilation system, including the blast, induced draft fan, adjustment door and gate opening, ventilation ducts and other conditions are good.
During the use of the boiler, the water temperature and water level probe should be cleaned regularly, and the descaling should be checked regularly; the boiling water furnace should be regularly drained from the boiling water outlet of the furnace body and the water outlet pipe and the water nozzle. Sewage must be done at least once a day.
Sewage method: Before the sewage discharge, the water level of the boiler is at a normal high water level, and the boiler pressure is carried out at 0.1-0.2MPA. Based on the principle of “diligent discharge, less discharge, and uniform discharge†(at least once a day), the short-term intermittent operation is carried out, that is, the sewage valve is opened. After that, it will be turned off, then turned off again, and repeated several times, until the water level is at a normal low water level. Remember not to empty the boiler.
Safety accessories such as pressure gauges and safety valves of boilers should be periodically checked to ensure their reliability (the pressure gauge is at least once every six months, and the safety valve is at least once every year).
After the horizontal fuel (gas) boiler is continuously operated for 12 months, open the smoke box door to clean the dust in the furnace or the pipe, check whether the smoke box cement is falling off, and repair the falling off.
Clean and paint the rust of exposed parts such as the base at least once a year.
Shutdown maintenance is divided into wet method and dry maintenance. For boilers that have no people (head) holes or have not been shut down for a long time, they should be maintained by wet method. For some people (head) holes or boilers with longer furnace shutdown time Dry maintenance should be used. For specific operation methods, please refer to the Boiler Instruction Manual.
Here you can find the related products in Dissolved Oxygen Meter, we are professional manufacturer of Dissolved Oxygen Meter,Dissolved Oxygen Tester,Portable Dissolved Oxygen Meter,Dissolved O2 Meter. We focused on international export product development, production and sales. We have improved quality control processes of Dissolved Oxygen Meter to ensure each export qualified product.
If you want to know more about the products in Dissolved Oxygen Meter, please click the product details to view parameters, models, pictures, prices and other information about Dissolved Oxygen Meter,Dissolved Oxygen Tester,Portable Dissolved Oxygen Meter,Dissolved O2 Meter.
Whatever you are a group or individual, we will do our best to provide you with accurate and comprehensive message about Dissolved Oxygen Meter!
Dissolved Oxygen Meter,Dissolved Oxygen Tester,Portable Dissolved Oxygen Meter,Dissolved O2 Meter
Xi'an Gavin Electronic Technology Co., Ltd , https://www.gaimcmea.com