How much does a hydropower reform a square to avoid spending money?

How much does a hydropower reform cost a square ? Nowadays, hydropower reform belongs to a relatively large part of the cost of renovation infrastructure projects. For most consumers, we must carry out the renovation of hydropower reforms when we must implement our family hydropower based on the current market prices and the overall cost of hydropower reform. The cost of reforming the budget must be calculated during the period of hydropower reform to solve various problems during the renovation of hydropower to avoid hidden dangers. Today, we invited a plumber with years of experience in home improvement to explain the precautions for home water and electricity decoration (90 square meters as an example), and specifically introduced how much the latest hydropower reform costs a square .

Hydropower renovation process

1, according to the design of the house and the specific needs of customers to design the direction of hydropower.

2. Workers are grooving walls or floors as they walk.

3, buried pipelines (including wiring and connected pipelines) and cassettes.

4, the detection circuit, the water pressure test.

5. Smooth the trunking with cement sand.

6. After the wall or wallpaper is finished, install the circuit panel.

Hydroelectricity Modification Precautions I. Waterway Section

(a) The design of the waterway should first consider all the equipment related to water, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, etc., their location, installation methods and the need for hot water;

(2) Whether it is better to use gas or electric water heaters in advance and avoid the temporary replacement of water heaters, resulting in repeated alteration of the waterway;

(3) It is advisable to have the owners present in the suppression test, which can play a supervisory role; because some decoration teams will deceive the owners in this link. The method is: When the pressure is applied, open the “return valve” of the pressure pump to form a loop. Although the pressure pump seems to work, there is not much pressure in the tube. Especially for the electric pressure pump, the students should pay more attention. If you don’t understand, ask a professional to help you look at it.

(4) If the extra floor drain is to be sealed, the gap between the drain pipe and the floor drain must be blocked to prevent the overflow of the water.

(e) In addition to leaving the bathroom with wash basins, toilets, washing machines and other outlets, it is best to take one out, and then pick up the water to the ground, etc. is very convenient; this depends on the owners of everyone like the problem.

(6) There should be pressure tests after the waterway reconstruction, but nowadays, many decoration teams do not suppress tests. They will lie to you in many ways, saying nothing to suppress, there is pressure in the pipes, and so on.

(7) After the location of the washing machine is determined, the drainage of the washing machine can be considered to be inside the wall of the drainage pipe, which is beautiful and convenient;

(8) After filling the kitchen floor tiles, check the discharge of water to see if the floor drain is smooth (to remove the drainage speed after the floor drain covers, because most of the deepwater floor drains have the problem of slow drainage);

(9) It is also very important that washing machine floor drains do not use deep water sealing floor drains. The drainage speed of washing machines is very fast and the drainage volume is large. The water discharge rate of deep water sealing floors cannot be met. The result will directly lead to water spillage.

(10) When using deep water sealing floor drain, it is necessary to clean up according to the use situation. Otherwise, the rubber pad below the floor drain will not achieve the sealing effect after hanging the dirty thing.

(11) When collecting houses, check whether each drain of the kitchen and bathroom is open. If the drain is slow, the property should be dredged in a timely manner; during the renovation, the drain outlet should be protected, especially during the period when the kitchen tile is tiled. Causes cement to fall into the drain outlet and cause clogging;

(12) When the waterway is reconstructed, attention should be paid to four points for the installation of electric hot water heaters, sub-tap and other reserved cold and hot water pipes.

1. The height of the hot and cold water nozzles is the same;

2, cold, hot water pipe nozzle should be higher than the wall two centimeters, shop walls should also be asked bricklayers finished after the completion of wall tiles to ensure the same level of wall tiles and water pipes. If the size is not appropriate, after installation of electric water heaters, sub-tap, etc., it may be necessary to purchase an additional pipe hoop, inner wire and other connectors to complete the installation;

3, cold, hot water supply pipe vertical wall surface, after the wall tile should also be careful not to let the bricklayer get it wrong (not vertical, then the installation can be strenuous);

4, to ensure that the spacing of 15 cm (now most of the electric water heaters, sub-water tap water hot and cold water are 15 cm, there are individual 10 cm);

(Thirteen) Do not forget to do waterproofing on the bathroom floor, especially on the ground. If the shower area is not a closed shower room, the waterproof surface of the wall should be 180 cm high to prevent the wall from sweating in the future. Before closing the cement, the 24-hour closed water test must be done. No problem can spread the bricks;

  

Hydroelectricity Modification Notice II. Circuit Section

(14) The design of the circuit must be determined after careful consideration of the possibilities, feasibility and availability. No one wants to pull wires on the floor of a new home. At the same time, the circuit design should also pay attention to its flexibility, and sometimes it should not be too "consummate." The death is resisted to sum up a relatively simple principle: In the more concentrated position of the electrical plug considers connecting a plug-in board in the future, the effect is often better than setting up the plug with full wall;

(15) The location of the socket is very important, and often the socket is just behind the bedside cabinet, causing the cabinet to fail against the wall. It is generally not wrong to let the outlet be as close as possible, but if you leave the location of the outlet improperly, it may conflict with the placement of the furniture or the installation of the electrical appliance in the later period. Students must remember;

(16) The bedroom ceiling light can be considered dual control (bedside and entrance);

(17) Some kitchen sockets are also convenient with switches, so as to avoid the inconvenience of pulling and unplugging rice cooker plugs from time to time, for example.

(18) The living room ceiling light can be equipped with sub-control switches (into the entrance hall and back to the main bedroom door) according to the needs of life;

(19) How to charge the cassette must be stated in advance. This is the most hidden and darkest profit point for the transformation of the water circuit. A cassette market is also one or two dollars, while the decoration team often charges more than ten dollars, and the average home improvement needs a small number of cassettes to be five or sixty. Therefore, it is normal for students to throw a few hundred dollars for this. Death is resisting to pull it out today and show it to the world. There is only one purpose. Let us remember five words: cut it hard!

(twenty) Observe whether there are modules in the telephone socket and the network cable socket;

(21) Spaces with mirrors and coat hooks should consider lighting near the mirror;

(22) The surround sound line should be buried when the circuit is modified.

(23) In the living room, master bedroom, and bathroom, the telephone line should be considered according to personal habits and convenience;

(24) Note that strong and weak wires cannot be in the same pipe and there will be interference;

(25) If the living room, kitchen, and bathroom are tiled, some locations may be appropriately considered without slotting;

(26) There is no need to set too many sockets behind the TV. It is better to put a patch panel on the side of the TV afterwards.

(27) The socket is generally 30CM away from the ground, not lower than 20CM, and the switch is generally 140CM away from the ground;

(28) A maximum of eight lines in a tube. Remember that the gap in each tube must not be less than 40%.

(29) The exhaust fan switch and telephone socket shall be installed near the toilet instead of the wall of the bathroom door;

(30) The Yuba should be considered to be installed near the shower room or bath rather than in the center of the bathroom.

(31) Circuit modification It is necessary to increase the line capacity in consideration of the use of household appliances.

(32) Reservations for sockets may be considered for balconies, corridors, and cloakrooms;

(33) Clear communication intentions and design ideas with workers. And draw the actual circuit transformation route on the wall;

(34) In the electrical code, it is required that buried pipe must be made of PVC pipe and change heads.

Hydroelectricity Modification Notes III. Water Circuit Integration Section

(35) Hydropower and hydropower reform is the biggest hidden project, and it is also the most expensive item in the increase item. The inability of workers to say how much it is depends on whether or not they follow the conventional methods.

  

How much does a hydropower reform a square

Hydroelectric reform is based on the layout of the pipeline. In the same 90-square-meter house, there will be a difference of a few thousand dollars in the price of hydropower reform. Because the design and each person's requirements are different, the number of switches, sockets, and lamps and lanterns are different, so the cost of hydropower reform is different.

Note: This price is for reference only! Due to geographical differences, of course, the price will be different. If you want to know more about the relevant price details, please use the local dealers to provide!

How to avoid spending money

1, waterway

Generally speaking, most construction companies tell you that the price of a pipe through two lines is the same as the price of two pipes after construction. In other words, if the pipe is buried, a line inside is 30 yuan/meter, and the same slot is opened. The same pipe is only put inside, but there are two lines in the pipe, but the price is 60 yuan/m. . In this way, you can spend more and more money. Obviously, such a billing method is unreasonable. When a pipe is worn through two lines, the cost of slotting and threading pipes is the same, and only the cost of that line should be added.

2, circuit aspects

Each switch socket needs to be equipped with a cassette. If you can, it is better to buy the cassette yourself. Please ask the decoration team to report the installation fee. A cassette supermarket also sells one or two dollars, and the construction party often quotes ten dollars, so the average family will casually spend hundreds more.

3, sign the decoration contract

Before the signing of the renovation contract, the designer is required to show the water circuit transformation drawings and calculate the number of possible transformations of telephone lines, power outlets, switch panels, waterway reconstructions, cable television lines, and network cable transformations. Reasonable expenses to avoid excessive increase in costs.

Editor's summary: The above is about how much money and one square of the hydropower reform to avoid spending money on the relevant introduction, hoping to help meet the needs of friends! For more information, please continue to pay attention to our website, follow-up will show more exciting content.

Home improvement hydropower reform hydropower reform how to avoid renovation contract pitfalls led lights how much a decoration about how much money hydropower reform how much money a square

Elevator Traction Machine Kits & Packages

Permanent magnet synchronous elevator gearless traction machine

VVVF asynchronous elevator geared traction machine gearbox worm gear

AC380V/50Hz Elevator Traction Machine, AC220V/60Hz Elevator Traction Machine,

Roping 1:1 2:1 4:1

Elevator Traction Machine Kits & Packages

Items Included Recommendations: Traction Machine, Encoder, protective cover, handwheel, machine bed, diverting pulley, damping pad as one package


Permanent magnet synchronous elevator gearless traction machine


OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Thyssen Elevator TRACTION MACHINE KITS & PACKAGES, KONE Elevator TRACTION MACHINE KITS & PACKAGES, GiantKONE Elevator TRACTION MACHINE KITS & PACKAGES, ThyssenKrupp Elevator TRACTION MACHINE KITS & PACKAGES, Schindler Elevator TRACTION MACHINE KITS & PACKAGES, XJ Schindler Elevator TRACTION MACHINE KITS & PACKAGES, Xizi OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Shanghai Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Fujitec Elevator TRACTION MACHINE KITS & PACKAGES, Hitachi Elevator TRACTION MACHINE KITS & PACKAGES, Toshiba Elevator TRACTION MACHINE KITS & PACKAGES, Hyundai Elevator TRACTION MACHINE KITS & PACKAGES, LG Elevator TRACTION MACHINE KITS & PACKAGES, Sigma Elevator TRACTION MACHINE KITS & PACKAGES, Express Elevator TRACTION MACHINE KITS & PACKAGES, GUANGRI Elevator TRACTION MACHINE KITS & PACKAGES, FUJI Elevator TRACTION MACHINE KITS & PACKAGES, BLT Elevator TRACTION MACHINE KITS & PACKAGES, CANNY Elevator TRACTION MACHINE KITS & PACKAGES, SJEC Elevator TRACTION MACHINE KITS & PACKAGES, KOYO Elevator TRACTION MACHINE KITS & PACKAGES, IFE Elevator TRACTION MACHINE KITS & PACKAGES

Elevator TRACTION MACHINE KITS & PACKAGES


OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Thyssen Elevator TRACTION MACHINE KITS & PACKAGES, KONE Elevator TRACTION MACHINE KITS & PACKAGES, GiantKONE Elevator TRACTION MACHINE KITS & PACKAGES, ThyssenKrupp Elevator TRACTION MACHINE KITS & PACKAGES, Schindler Elevator TRACTION MACHINE KITS & PACKAGES, XJ Schindler Elevator TRACTION MACHINE KITS & PACKAGES, Xizi OTIS Elevator TRACTION MACHINE KITS & PACKAGES, Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Shanghai Mitsubishi Elevator TRACTION MACHINE KITS & PACKAGES, Fujitec Elevator TRACTION MACHINE KITS & PACKAGES, Hitachi Elevator TRACTION MACHINE KITS & PACKAGES, Toshiba Elevator TRACTION MACHINE KITS & PACKAGES, Hyundai Elevator TRACTION MACHINE KITS & PACKAGES, LG Elevator TRACTION MACHINE KITS & PACKAGES, Sigma Elevator TRACTION MACHINE KITS & PACKAGES, Express Elevator TRACTION MACHINE KITS & PACKAGES, GUANGRI Elevator TRACTION MACHINE KITS & PACKAGES, FUJI Elevator TRACTION MACHINE KITS & PACKAGES, BLT Elevator TRACTION MACHINE KITS & PACKAGES, CANNY Elevator TRACTION MACHINE KITS & PACKAGES, SJEC Elevator TRACTION MACHINE KITS & PACKAGES, KOYO Elevator TRACTION MACHINE KITS & PACKAGES, IFE Elevator TRACTION MACHINE KITS & PACKAGES

Assembly Line of Elevator Machine


Elevator Traction Machine, Elevator Geared Machine, Elevator Gearless Machine, Geared Traction Machine, Gearless Traction Machine

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjelevatordoorsystem.com